Due to the L5640 generation to strong and low power consumption CPU still used by some hosts in Los Angeles, the operation performance of the server CPU is low. We plan to upgrade the IP segment of 191.101.175.2-255 from February 20 to 28, 2019 (at night). Segment 192.158.227.2-255 will upgrade the following IP segment from March 4 to 9 (the CPU will be upgraded to E5 2680V2) : 191.101.175.2-255 192.158.227.2-255 server will be offline for 2-4 hours during the upgrade. In order to reduce the impact of offline network caused by the upgrade process on users, we will upgrade this IP segment at night. The CPU performance of the upgraded cloud server will be qualitatively improved.